Phase 1 is Underway

Phase 1 is underway at Oakwood Schools.  To review the projects planned, visit the MFP section of our website. 

All required public documentation for the project will be posted here.

Public Notification

Summer 2020 Scope of Work

OJH/OHS
  • Major roof replacement
  • Installation of new HVAC system to the OHS side of building
  • Installation of new HVAC to auditorium
  • New controls for the HVAC system
  • Installation of new electric transformer
  • New electrical services and some wiring
  • Remodel Room 140 to Athletic Office
  • Remodel current AD office as classroom
  • Demolition of ceilings in OHS side of building
  • Demolition of bathrooms plumbing, fixtures and ceilings
  • Adding family restroom to senior hallway
  • Remodel of bathrooms
  • Installation of new manhole to control exit sewage plumbing
  • Ceiling replacements with new LED lighting in classrooms and corridors
  • New clock system
  • New PA system
  • New phone system
  • Environmental abatement as required
Smith Elementary
  • Demolition of old boilers
  • Installation of new boilers
  • Demolition of bathroom fixtures and plumbing
  • Remodel bathrooms including new plumbing, fixtures, wall coverings partitions and ceilings
  • Roof repairs
  • New Kiln and exhaust system (could move to 2021)
  • Environmental abatement as requirement
Harman Elementary
  • Demolition of old boilers
  • Installation of new boilers
  • Demolition of bathroom fixtures and plumbing
  • Remodel bathrooms including new plumbing, fixtures, wall coverings partitions and ceilings
  • Roof repairs
  • Environmental abatement as required

Free and Reduced Lunch

Oakwood Schools elementary schools offer healthy meals each full school day. Elementary lunch costs $ 3.00. 

Your children may qualify for free meals or for reduced-price meals. Reduced price is $ .40  for lunch. 

Visit the Free and Reduced Lunch Program page for answers to frequently asked questions, directions on completing the application and the required application.

logo of From the Ground Up

Please stay up to date on all of the activity in the District concerning Operations by following my blog.

Work Wednesday

Take a look at how Master Facilities Plan Phase 1 is progressing.

OJH/OHS Work - Feb. 2020

Scope of Work:

  • Under full containment, removal of an estimated 320 feet of asbestos-containing TSI (pipe insulation) in the attic.
  • At the completion of abatement and encapsulation, and approved inspection, the third party consultant will run a set of clearance air samples to prove the area is safe for reentry.
  • All personnel will be licensed and trained in the proper procedures for handling asbestos containing materials. All work will be performed in accordance with all Federal, State and Local laws and regulations governing asbestos abatement.

Letter of Explanation
Air Sample Analysis following work


Smith Elementary Work - Feb. 2020

Scope of Work:

  • Scrape and or Ice Blast loose paint from all surfaces in the boiler room.
  • Clean surfaces limited to horizontal, supplies, boiler tops, tools etc. that are contaminated with lead paint. There is approximately 5500 sq. ft. of surfaces involved in this cleanup.
  • Provide a TCLIP (under add alternate) for all waste generated for disposal purposes.
  • Dispose of waste in accordance with the EPA, based on the TCLIP results.
  • Dispose of general waste that is deemed non-usable as C&D waste.

The Lead Safe Certified Guide to Renovate Right